News

A 5U 8-GPU Server That Runs Cool? TFNEW ZH-5201-LC

TFNEW launched the ZH-5201-LC, a 5U rackmount liquid-cooled server with 2x liquid-cooled 4th/5th Gen Xeon (385W), 32 DDR5 RDIMM slots and up to 8 GPUs (10 via Switch backplane) where liquid CPUs free the airflow budget for accelerators.

A 5U 8-GPU Server That Runs Cool? TFNEW ZH-5201-LC

A 5U 8-GPU Server That Runs Cool? TFNEW ZH-5201-LC

TL;DR: TFNEW launched the ZH-5201-LC, a 5U rackmount liquid-cooled server, on September 21, 2026. On 2x liquid-cooled 4th/5th Gen Intel Xeon (385 W TDP) and 32 DDR5 RDIMM slots, it hosts up to eight full-height full-length dual-width rendering GPUs or AI compute cards (up to ten via Switch backplane) with liquid cooling — sustained clocks and workstation-class thermals in a 5U frame. Get specs and pricing: sales@tfnew.com.

Core Specifications (with Plain-Language Terms)

The ZH-5201-LC is the 5U member of TF NEW's liquid-cooled rack line: dual 4th/5th Gen Intel Xeon at 385 W TDP each with liquid cooling on an Intel C741 chipset, and 32 DDR5 RDIMM slots at 5600 MT/s. Its GPU profile is 8 full-height full-length dual-width cards — rendering GPUs or AI compute cards — connected through either a 12-slot PCIe passthrough board or a 13-slot Switch expansion backplane, supporting up to ten PCIe 5.0 x16 GPU cards. Because the CPUs are liquid-cooled, the airflow budget belongs to the accelerators, which keeps eight (or ten) dual-width cards at sustained clocks without the thermal headroom fights of air-cooled 5U frames. Power is 4x CRPS (2000 W / 2700 W options); cooling is supported by high-performance fans for the remaining airflow; management is DC-SCM 2.0 with AST2600 BMC (IPMI 2.0 / Redfish); networking is 1x management port plus 1x OCP 3.0.

Specs at a Glance

Item ZH-5201-LC Value
Form 5U rackmount liquid-cooled server
Processor 2x 4th/5th Gen Intel Xeon, 385 W TDP, liquid-cooled
Memory 32x DDR5 RDIMM, 5600 MT/s
GPU Up to 8x FHFL dual-width rendering GPUs / AI cards
PCIe 12-slot passthrough or 13-slot Switch backplane, up to 10x PCIe 5.0 x16
Management DC-SCM 2.0, AST2600, IPMI 2.0 / Redfish
Power 4x CRPS, 2000 W / 2700 W
Network 1x management port, 1x OCP 3.0

Why Liquid CPUs Free the Airflow Budget

In an air-cooled GPU server, CPUs and GPUs fight for the same airflow; raising CPU load means starving cards. Liquid-cooling the processors removes them from that fight entirely — radiator loops handle two 385 W Xeons, and every cubic meter of chassis airflow goes to the eight or ten dual-width cards in front. The practical result is stable GPU clocks under mixed CPU+GPU load, which is exactly the profile of rendering jobs (CPU scene processing beside GPU rasterization) and AI workloads (CPU data plumbing beside GPU compute).

Where It Fits

  • Rendering farms: 8–10 GPUs at sustained clocks, CPU scene work uncapped
  • AI training and inference: dual Xeon + 32 DDR5 beside accelerator density
  • Mixed CPU/GPU workloads: liquid CPUs stop stealing card airflow
  • Power-conscious racks: 4x CRPS keeps the power envelope predictable

Why the Numbers Matter

  • 8 GPUs (up to 10 via Switch): flagship density in a 5U liquid-cooled frame
  • Liquid-cooled dual Xeon: CPU heat out of the chassis airflow budget
  • 12-slot passthrough / 13-slot Switch: topology choice per workload
  • 32x DDR5 at 5600 MT/s: memory for rendering scenes and model weights
  • DC-SCM 2.0 + OCP 3.0: serviceable management and modern NIC interface

What TF NEW Says

"Every GPU server is an airflow negotiation; liquid cooling just changes who wins," said a TF NEW product manager. "The ZH-5201-LC cools two 385 W Xeons with coolant so eight-to-ten dual-width cards get the chassis airflow to themselves — sustained clocks for rendering and AI, in a 5U frame with DC-SCM 2.0 management."

Quality and Availability

Every ZH-5201-LC is pressure-tested and burn-in validated — CPUs, GPU paths and liquid loop run 48 hours under full load before shipping, with leak-tested fittings and documented loop maintenance. It ships deployment-ready with DC-SCM 2.0 baselines.

Pricing and Availability

The ZH-5201-LC is available now. Pricing varies with processor, memory, GPU and power configuration. Contact sales@tfnew.com or use the request-a-quote form at www.tfnew.com/contact for configuration guidance and lead time.

About TF NEW

TF NEW (TF New Technology) is an enterprise AI infrastructure provider based at www.tfnew.com. It designs and delivers private AI, compute, networking, storage, cooling and edge systems as deployment-ready solutions — AI servers, AI workstations, edge AI, liquid cooling and enterprise rack servers — for AI factories, datacenters and edge projects worldwide.

Media Contact

TF NEW | sales@tfnew.com | www.tfnew.com/contact

FAQ

  1. What is the ZH-5201-LC? A 5U rackmount liquid-cooled server with 2x liquid-cooled 4th/5th Gen Xeon and up to 8 GPUs (10 via Switch).
  2. How many GPUs can it hold? Eight full-height full-length dual-width cards, up to ten with the Switch backplane.
  3. Why liquid-cool the CPUs? It removes CPU heat from the chassis airflow budget, so accelerators get sustained cooling and clocks.
  4. What interconnect options are there? A 12-slot passthrough board or a 13-slot Switch expansion backplane.
  5. What management does it use? DC-SCM 2.0 with AST2600 BMC (IPMI 2.0 / Redfish).